The Globe and Mail

Go to the Globe and Mail homepage

Jump to main navigationJump to main content

Globe Investor

News Sources

Take control of your investments with the latest investing news and analysis

Press release from Marketwire

CFI's New Vein Discovery at Grebes Nest Breaking Through a 1.3 km Strike Length With a Vein Intersection Having an Average Grade of 71.39% CaF2 Over 17.01 Metres

Tuesday, August 20, 2013

CFI's New Vein Discovery at Grebes Nest Breaking Through a 1.3 km Strike Length With a Vein Intersection Having an Average Grade of 71.39% CaF2 Over 17.01 Metres

08:25 EDT Tuesday, August 20, 2013

ST. JOHN'S, NEWFOUNDLAND--(Marketwired - Aug. 20, 2013) - Canada Fluorspar Inc. (TSX VENTURE:CFI)(OTC:CNDFF) ("CFI" or the "Company") is pleased to announce the fifth set of assay results under the Company's Phase 3 diamond drilling program from three drill holes on its Grebes Nest property. One of the drill holes, GS-13-21, located approximately 400 metres southeast of the previously reported drill hole GS-13-19 (press release dated August 12, 2013) intersected a vein structure having an average grade of 71.39% CaF2 over 17.01 metres. Two additional drill holes, GS-13-20 and GS-13-04, are located about 400 metres and 900 metres, respectively, northwest along strike from drill hole GS-13-21. The new vein structure is situated approximately 4 km from the former Tarefare Mine and less than 6 km from the former Blue Beach North Mine (see location map below). The three drill holes are located on the western end of the Grebes Nest grid area. Ground geophysical (magnetometer and EM) survey results indicate that the mineralized structure has potential to extend for more than 4,000 metres along strike.

Drill hole GS-13-21 was inclined at -45º and oriented at azimuth 34º, drill hole GS-13-20 was inclined at -60º and oriented at azimuth 34º and drill hole GS-13-04 was inclined at -70º and oriented at azimuth 34º.

To view the first map associated with this press release, please visit the following link: http://media3.marketwire.com/docs/CFI0820a.pdf

Assay Results

Drill hole GS-13-04 tested the down-dip extension of the Grebes Nest Vein on the same plane as drill hole GS-13-03, a previously reported (press release dated July 11, 2013) drill hole from the first assay results reported in the Phase 3 drilling program. This hole intersected a vein structure having an average grade of 28.13% CaF2 over 8.00 metres and intersected the vein at a depth of about 175 metres vertically below surface. This vein is presently being tested further down depth with drill hole GS-13-27 (in progress).

Drill hole GS-13-20 intersected two significant vein structures: the first vein intersection having an average grade of 42.46%% CaF2 over 9.70 metres and a second vein intersection having an average grade of 50.65% CaF2 over 7.77 metres.

Drill hole GS-13-21 intersected a significant vein structure having an average grade of 71.39% CaF2 over 17.01 metres and intersected the Grebes Nest Vein about 60 metres vertically below surface.

To view the second map associated with this press release, please visit the following link: http://file.marketwire.com/release/CFI0820b.pdf

"These latest drill results confirm a strike length for West Grebes Nest vein to be over 1.3 kms," stated Lindsay Gorrill, President & CEO of the Company. "I am also very encouraged by both width and grade of this latest finding and that the silica content is lower and blastonite, a brecciated fluorite in an admix of microcrystalline quartz and fluorite is virtually absent compared to the other granite-hosted veins."

Geological Interpretation

CFI has received assay results for samples collected from drill holes GS-13-04, GS-13-20 and GS-13-21 located along the western part of the Grebes Nest target area. The three drill holes intersected mineralization that has been interpreted to be the Grebes Nest vein which trends northwest-southeast and is steeply dipping.

Drill hole GS-13-04 is located in the same plane as a previously reported drill hole GS-13-03 (press release dated July 11, 2013) and intersected the main structure at a depth of about 175 metres vertically below surface.

Drill hole GS-13-20 located on the same plane as a previously reported drill hole GS-13-19 (press release dated August 12, 2013). These two holes confirm the Grebes Nest Vein to having a strike length of approximately 925 metres as reported in the most recent press release dated August 12, 2013. Drill hole GS-13-20 was designed to test the vein structure down-depth to about 130 metres vertically below surface and about 60 metres vertically below the drill hole GS-13-19 intersection.

Drill hole GS-13-21 is spaced about 400 metres southeast along strike from drill holes GS-13-19 and GS-13-20 and extends the Grebes Nest Vein along strike for a length of about 1,325 metres.

Preliminary interpretation of the drill results indicates that the western part of the target area of the mineralized Grebes Nest structure maintains a relatively uniform width along strike and within a vertical depth of 175 metres below the surface. The drill intersections also indicate very competent core and good continuity of mineralized material at depth. CFI notes that most of the mineralized material is hosted by metasedimentary rocks (interbedded siltstones and shales, whereas most of the mineralized material at the major fluorspar veins in the general area - the historic Director, Tarefare, and Blue Beach North Mines - are hosted by the St. Lawrence Granite ("SLG")). The metasedimentary rocks in the St. Lawrence area are older than the SLG and early geological mapping indicates that the Grebes Nest area is underlain by interlayered pink rhyolite sills, similar in composition to the SLG, which intruded the metasedimentary rocks. The structure that has been identified by the drill program is a late phase event that cuts both the metasedimentary rocks and the sills. The parallel veins, such as the vein identified in drill hole GS-13-20, have been known to develop into significant mineable veins in other locations in the St Lawrence area. The significance of the parallel veins remains to be evaluated.

The following table shows the detailed results of the second set of drill holes completed by CFI on the Grebes Nest Vein noted in Phase 3 of the Company's 2013 exploration diamond drill program.

2013 Diamond-Drill Hole Assay Results
Grebes Nest - Phase 3
Canada Fluorspar Inc.
St. Lawrence Project, NL
Hole GS-13-04
Sample No. From
(m)
To
(m)
Length
(m)
% CaF 2
65425 168.00 169.00 1.00 22.66
65426 169.00 170.00 1.00 27.55
65427 170.00 171.00 1.00 56.65
65428 171.00 172.00 1.00 26.24
65429 172.00 173.00 1.00 21.51
65430 173.00 174.00 1.00 11.31
65431 174.00 175.00 1.00 17.58
65432 175.00 176.00 1.00 41.53
Hole GS-13-20
Sample No. From
(m)
To
(m)
Length
(m)
% CaF 2
Vein #1
108448 118.79 119.79 1.00 40.57
108449 119.79 120.79 1.00 69.65
108450 120.79 121.51 0.72 55.05
108451 121.51 122.51 1.00 21.80
108452 122.51 123.51 1.00 36.86
108453 123.51 124.51 1.00 37.33
108454 124.51 125.51 1.00 57.37
108455 125.51 126.51 1.00 37.64
108456 126.51 127.44 0.93 31.64
108457 127.44 128.49 1.05 39.60
Vein #2
108466 134.23 135.17 0.94 27.61
108467 135.17 136.00 0.83 27.43
108468 136.00 136.85 0.85 47.25
108469 136.85 137.93 1.08 85.24
108470 137.93 138.93 1.00 39.90
108471 138.93 139.54 0.61 37.99
108472 139.54 140.54 1.00 77.93
108473 140.54 141.10 0.56 69.09
108474 141.10 142.00 0.90 36.56
Hole GS-13-21
Sample No. From
(m)
To
(m)
Length
(m)
% CaF2
108478 59.74 60.39 0.65 46.25
108479 60.39 61.00 0.61 92.14
108480 61.00 62.00 1.00 86.14
108481 62.00 63.00 1.00 8.29
108482 63.00 64.00 1.00 29.70
108483 64.00 67.00 3.00 79.44
108484 67.00 68.00 1.00 68.72
108485 68.00 69.00 1.00 84.90
108486 69.00 70.00 1.00 83.13
108487 70.00 73.00 3.00 91.91
108488 73.00 76.00 3.00 82.03
108489 76.00 76.75 0.75 9.40

Assays on these drill holes were carried out at SGS Lakefield Laboratories ("SGS") of Lakefield, Ontario, using the Ion Selective Electrode method to determine the fluorite content in the low-grade samples and the Dual Calcium method for samples expected to contain high-grade values (i.e., those with significant visible fluorspar in the drill core).

Quality Assurance and Quality Control ("QA/QC")

Check assay work by CFI includes insertion of duplicate samples and blanks with regular batches of mineralized samples of drill core. QA/QC work is also done at SGS, and results are reviewed and verified by CFI personnel. An independent geological consultant (Qualified Person) has submitted additional samples collected from the drill core for analyses.

Phase 1 of the 2013 exploration program was designed to assess the northern extension of the Director Vein structure. The six drill holes with assay results to date have shown that the fluorspar mineralization at the Director Vein extends further along strike and at depth from the old Aluminum Company of Canada ("Alcan") workings.

Phase 2 of the 2013 exploration program was designed to evaluate the southern extension of the Director Vein. A trenching program and a geophysical survey conducted in the area during 2012 identified the structure over a strike length of 1,000 metres. The current drill program was planned to evaluate the mineral potential, at depth, of the southern extension of Director Structure and to test the north extension of the adjacent Hares Ears Vein to the west.

Phase 3 of the 2013 exploration program was designed to evaluate the Grebes Nest mineral property, namely the Grebes Nest vein which was identified in the 1940s. The vein was exposed on the east side of Little Lawn Harbour where the structure is approximately 1 metre wide and dips to the north at -70 degrees. Prospecting in the late 1940s traced the structure, through a series of trenches, to the southeast for a reported distance of 3.2 kilometers. In the late 1940s, a 20 metre deep exploration shaft was sunk on the vein about 500 metres east of the coast. A drift was driven along the vein for 60 metres and a number of short cross-cuts were developed. In 1949, five short drill holes were completed approximately 1 km southeast of the shaft and to the south of the projected strike of the structure. These drill holes identified a number of narrow veins in the metasediments. Due to the remote location of the showing and the adequate reserves at the operating mines owned by Alcan, no additional work was undertaken.

Initial exploration information regarding the 2013 exploration program at Director Vein was included in the Company's press releases dated January 16, 2013 and March 12, 2013.

To date, six Phase 1 drill holes have been completed together with 26 additional drill holes in Phase 2 (19 holes in south extension Director Vein and seven holes at Hares Ears Vein) and 27 drill holes in Phase 3 (Grebes Nest area) of the 2013 exploration program. Assay results for remaining completed drill holes in Phase 2 and Phase 3 are pending.

Historic exploration data indicates that there are more than 40 mineralized veins within the CFI property. The three prominent vein structures, however, are the Director Vein, Blue Beach North Vein, and the Tarefare Vein. Probable Reserves of the Blue Beach North and Tarefare veins total approximately 5.4 million tonnes at an average grade of 39.8% CaF2. These Mineral Reserves have been outlined to a vertical depth of 300 metres below the surface, but fluorspar mineralization extends further at depth. The key assumptions, parameters and methods used to estimate the Mineral Resources and Mineral Reserves, as well as other relevant information, including data verification, with respect to the Blue Beach North and Tarefare veins can be found in a NI 43-101 Technical Report prepared by the Roscoe Postle Associates Inc. dated March 6, 2013, which has been filed by the Company on SEDAR (www.sedar.com).

About the Company

The Company is a specialty mineral resource company engaged in the development of fluorspar deposits located in St. Lawrence, Newfoundland, Canada, and is proposing, through Newspar, its 50/50 joint venture with Arkema, to reactivate the existing Blue Beach North and Tarefare underground fluorspar mines, by expanding the existing mill and constructing a new, environmentally-sound Tailings Management Facility.

Mr. James H. Reeves, Senior Geologist with CFI, who is a Qualified Person as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Properties, reviewed and approved the technical content of this news release. The information regarding historic production has not been verified by the Company and is provided for reference only.

Material results of the Company's 2012 and 2013 exploration program have been disclosed in the Company's press releases dated March 1, 13 and 30, 2012, April 16 and 24, 2012 and January 16, 2013, March 12, 2013, April 24, 2013, May 8, 2013, June 5, 2013, July 2, 2013, and July 11, 2013 including assay results from eighteen (21) previous drill holes under the Company's diamond drilling program which were disclosed in the Company's press releases dated March 12, 2013, April 24, 2013, May 8, 2013, June 5, 2013, July 2, 2013, July 11, 2013, July 18, 2013, August 6, 2013 and August 12, 2013.

For more information please see: www.canadafluorspar.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note and Forward-Looking Statements

This press release contains forward-looking statements which include, but are not limited to: resource estimates, proposed mining techniques required to construct and produce at expected levels, anticipated timing for completion of metallurgical testing, the commencement of the drilling program, current development and operating objectives and outlook, expectations, opinions, forecasts, projections, guidance or other statements that are not statements of fact. Although the Company believes that the expectations reflected in such forward-looking statements are reasonable, it cannot give any assurance that such expectations will prove to be correct. Results of the Company may be affected by a variety of variables and risks associated with mining development including: loss of market, volatility of commodity prices, currency fluctuations, imprecision of reserve estimates, environmental risks, competition from other producers, ability to access sufficient debt and equity capital from internal and external sources, ability to generate sufficient cash flow to meet its current and future obligations, regulatory approvals affecting construction and mining operations. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to, assumptions about the following: the availability of financing for exploration and development activities, the estimated timeline for the development of the project at St. Lawrence, the supply and demand for, and the level and volatility of the price of fluorspar, the assumptions on which resource estimates are based, the receipt of necessary permit, market competition, ongoing relations with employees and impacted communities, and general business and economic conditions. Should one or more of the risks or uncertainties involved in forward-looking statements materialize, or should the assumptions prove incorrect, actual results may vary materially from those anticipated, believed, estimated or expected. Accordingly, readers should not place undue reliance on forward-looking statements.

Forward-looking statements are qualified entirely by this cautionary statement and are given only as at the date of this press release. The Company disclaims any obligation to update or revise any forward looking statements, whether as a result of new information, future events or otherwise, except as required by law.

FOR FURTHER INFORMATION PLEASE CONTACT:

Contact Information:
Canada Fluorspar Inc.
Lindsay Gorrill
President and CEO
1-800-823-8095
lgorrill@canadafluorspar.com
www.canadafluorspar.com

Products
  • Globe Unlimited

    Digital all access pass across devices. subscribe

  • The Globe and Mail Newspaper

    Newspaper delivered to your doorstep. subscribe

  • Globe2Go

    The digital replica of our newspaper. subscribe

  • Globe eBooks

    A collection of articles by the Globe. subscribe

See all Globe Products

Advertise with us

GlobeLink.ca

Your number one partner for reaching Canada's Influential Achievers. learn more

The Globe at your Workplace
Our Company
Customer Service
Globe Recognition
Mobile Apps
NEWS APP
INVESTING APP
Other Sections