Go to the Globe and Mail homepage

Jump to main navigationJump to main content

AdChoices
Traffic crosses the Pattullo Bridge in New Westminster, B.C., on July 2, 2015. (Rafal Gerszak For The Globe and Mail)
Traffic crosses the Pattullo Bridge in New Westminster, B.C., on July 2, 2015. (Rafal Gerszak For The Globe and Mail)

Metro Vancouver Pattullo Bridge must be replaced or closed by 2023: report Add to ...

A report to Translink warns an aging bridge in Metro Vancouver may not be able to withstand an earthquake or even a powerful wind storm and must be replaced, or closed, in less than a decade.

The recommendations are contained in a report from Sany Zein, Translink’s acting vice-president of Infrastructure,Management and Engineering.

The report says the 79-year-old Pattullo Bridge connecting Surrey and New Westminster, “represents TransLink’s most urgent major infrastructure risk.”

It says a feasibility study is underway to determine if systems can provide advance warning of wind storms or earthquakes powerful enough to affect the bridge.

But Zein also warns that any upgrades would be technically challenging and too expensive for serious consideration.

The report says the lifespan of the bridge – which is used by more than 80,000 vehicles every day – is estimated at about seven years.

Report Typo/Error

Also on The Globe and Mail

Prince William and Catherine meet Vancouver mothers battling addiction (CP Video)

Next story

loading

In the know

The Globe Recommends

loading

Most popular videos »

Highlights

More from The Globe and Mail

Most popular