Skip to main content

Nevada Sunrise Metals Corp(NEV-X)
TSX Venture

Today's Change
Delayed Last Update

Nevada Sunrise Intersects 1,321 ppm Lithium in Sediments over 990 feet and 116.43 mg/L Lithium in Groundwater over 140 feet at the Gemini Lithium Project, Nevada

Newswire.ca - Tue Feb 28, 2023

VANCOUVER, BC, Feb. 28, 2023 /CNW/ - Nevada Sunrise Metals Corp. ("Nevada Sunrise", or the "Company") (TSXV: NEV) (OTC: NVSGF) is pleased to announce that the Company has received initial geochemical analyses for lithium mineralization in sediment and groundwater samples collected from the first 1,500 feet (457.32 metres) of borehole GEM23-04, drilled at its 100%-owned Gemini Lithium Project ("Gemini") located in the Lida Valley basin in Esmeralda County, Nevada. Drilling of borehole GEM23-04 began on January 10, 2023 and was completed to a depth of 1,950 feet (594.51 metres) on February 22, 2023, which represents the deepest hole drilled to date at Gemini. The remaining samples collected in the final 450 feet (137.20 metres) of hole GEM23-04 are still in analytical process.

Read more at newswire.ca

Provided Content: Content provided by Newswire.ca. The Globe and Mail was not involved, and material was not reviewed prior to publication.

More from The Globe