Skip to main content

Capstone Infrastructure Corp Pref A(CSE-PR-A-T)
TSX

Today's Change
Real-Time Last Update

Capstone Infrastructure Corporation Signs Power Purchase Agreement with Pembina Pipeline Corporation for the Wild Rose 2 Wind Farm

Globe Newswire - Sun May 8, 2022

Calgary, May 08, 2022 (GLOBE NEWSWIRE) -- Capstone Infrastructure Corporation (TSX: CSE.PR.A) ("Capstone") announces today that its wholly owned subsidiary, Wild Rose 2 Wind LP, has entered into a power purchase agreement (“PPA”) with Pembina Pipeline Corporation (TSX: PPL; NYSE: PBA) (“Pembina”) for the offtake of 105 MW of renewable energy and associated renewable attributes over 15-years from Capstone’s 192 MW Wild Rose 2 Wind Farm, currently in development.  Capstone has also entered into a turbine supply agreement with Siemens Gamesa Renewable Energy Inc. for the procurement of 38 SG 5.2-145 turbines. The PPA signals another step forward towards a low-carbon electricity sector in Alberta and provides the foundation that supports Capstone’s investment in the 192 MW Wild Rose 2 Wind Farm.

Read more at globenewswire.com

Provided Content: Content provided by Globe Newswire. The Globe and Mail was not involved, and material was not reviewed prior to publication.

More from The Globe